TM 9-2350-277-20-2
CLEAN RADIATOR — Continued
0228 00
12. Secure radiator access door (1) to radiator opening with two fasteners (2).
13. Secure radiator access panel (3) to power plant compartment bulklhead with two clamps (4) and bolts (5).
FOLLOW-THROUGH STEPS
1.
Install power plant bottom access cover (WP 0450 00).
2.
Install driver’s power plant access pane (WP 0441 00).
3.
Install power plant rear access panels (WP 0439 00).
4.
Close power plant access door. See TM 9-2350-277-10.
END OF TASK
0228 00-4
Change 5