TM-9-2350-277-20-3

CARRIER M113A3, M577A3, M1059A3, M1064A3, M1068A3 AND M58

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL VOLUME 3 OF 6

  TM-9-2350-277-20-3 - Page 788 of 941

TM 9-2350-277-20-3
CHECK TRANSMISSION BRAKE ADJUSTMENT
0406 00
THIS WORK PACKAGE COVERS:
Check brake adjustment (page 0406 00-1).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Torque Wrench (WP 0926 00, Item 85)
Personnel Required
Mechanic
Helper (H)
References
TM 9-2350-277-10
Equipment Condition
Engine stopped (TM 9-2350-277-10)
Carrier blocked (TM 9-2350-277-10)
Power plant access door open (TM 9-2350-277-10)
Hull front access cover removed (WP 0449 00)
Parking brake released (TM 9-2350-277-10)
CHECK BRAKE ADJUSTMENT
1.
(H) Start engine and allow to warm up. See TM 9-2350-277-10.
2.
Watch brake shaft indicators (1) and (2) through power plant front access hole (3).
040600-1
Change 5


Back to Top