TM 9-2350-277-20-4
REPLACE FORWARD UPPER RIGHT AND LEFT SIDE SPALL
LINERS (M113A3 ONLY)
0508 00
THIS WORK PACKAGE COVERS:
Removal (page 0508 00-1).
Installation (page 0508 00-2).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Screwdriver, Cross-Tip (WP 0926 00, Item 46)
Materials/Parts
Lockwasher (14)
Personnel Required
Unit Mechanic
Equipment Condition
Engine stopped (TM 9-2350-277-10)
Carrier blocked (TM 9-2350-277-10)
Ramp lowered (TM 9-2350-277-10)
REMOVAL
NOTE
Seven identical screws, washers, and lockwashers secure spall liners on the upper right and left
sides of carrier overhead. Spall liners on both sides are removed and installed the same way.
1.
Remove seven screws (1), washers (2), and lockwashers (3) from spall liner (4). Remove spall liner from ceiling.
Discard lockwashers.
050800-1
Change 5