TM-9-2350-277-20-5

CARRIER M113A3, M577A3, M1059A3, M1064A3, M1068A3 AND M58

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL VOLUME 5 OF 6

  TM-9-2350-277-20-5 - Page 790 of 1047

TM 9--2350--277--20--5
REPL ACE NBC F I LT ER SWIT CH AND M O UNT BRACKET ( M 577A3 O NLY)
0803 00
INSTALLATION
1.
Install bracket (1), two screws (2), four washers (3), and two new locknuts (4) on frame (5).
2.
Install ground lead (6) onto frame (5) with nut (7), new lock washer (8), flatwasher (9), and screw (10).
3.
Inst a l l swi t c h a sse m bl y (11), c ove r (12) t wo sc re ws (13), four wa she rs (14), t wo ne w l oc kwa she rs (15) a nd
t
(16) on bracket (1).
4.
Connect circuit 579A (17) to circuit breaker (18) on switch assembly (11) and circuit lead 415 (19).
5.
Connect circuit 537F (20) and ground lead (6) to light (21) on switch assembly (11).
6.
Connect circuit 579C (22) to switch (23).
FOLLOW--THROUGH STEPS
1.
Connect battery ground lead (WP 0338 00).
END OF TASK
Change 2
0803 00--3/4 blank


Back to Top