TM-9-2350-277-20-6

CARRIER M113A3, M577A3, M1059A3, M1064A3, M1068A3 AND M58

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL VOLUME 6 OF 6

  TM-9-2350-277-20-6 - Page 342 of 487

TM 9-2350-277-20-6
REPLACE MSD/ICE ENGINE WIRING HARNESS — Continued
0882 00
11. Connect lead (1) to airbox pressure transducer (2).
12. Connect leads (3) to generator main cable (4).
13. Install ground leads (5) on generator. Secure with new lockwasher (6) and nut (7).
FOLLOW-THROUGH STEPS
1.
Install power plant (WP 0156 00).
END OF TASK
0882 00-7/8 blank
Change 5


Back to Top