TM 9-2350-277-34
REPLACE FRONT MAIN WIRING HARNESS — Continued
0030 00
FOLLOW-THROUGH STEPS
1.
Connect battery ground strap. See TM 9-2350-277-20.
2.
Close power plant front access door. See TM 9-2350-277-10.
3.
Raise power plant access cover. See TM 9-2350-277-10.
4.
Start engine. See TM 9-2350-277-10.
5.
Check that master switch panel, instrument panel, distribution box, and lights work right. See TM 9-2350-277-10.
6.
Stop engine. See TM 9-2350-277-10.
7.
Turn MASTER SWITCH to OFF. See TM 9-2350-277-10.
END OF TASK
0030 00-37/38 blank
Change 5