TM 9-2350-277-34
REPLACE FRONT MAIN WIRING HARNESS — Continued
0030 00
25. From inside of power plant compartment, place harness (4) on driver’s bulkhead. Secure with three clamps (3), new
lockwashers (2), and screws (1).
26. Connect circuit 452 lead (9) to front bilge pump (10).
27. Install two screws (5), new lockwashers (6), and four flat washers (7) securing bilge pump strainer (8) to weld nuts.
0030 00-27
Change 5