INSTALL PERSONNEL HEATER KIT (M1064A3 ONLY) — Continued
0073 00
FOLLOW-THROUGH STEPS
1.
Open fuel shutoff cock (see your -10). Check for leaks.
2.
Connect battery ground lead (see your -20).
3.
Start personnel heater (see your -10). Check installation for proper operation and leaks.
4.
Turn personnel heater OFF (see your -10).
5.
Install fire extinguisher (see your -20).
6.
Install floor plates (see your -20).
7.
Install power plant rear access panel (see your -20).
8.
Start engine (see your -10).
9.
Raise and lock ramp (see your -10).
10. Stop engine (see your -10).
END OF TASK