TM-9-2350-311-20-1

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR HULL, POWERPLANT, DRIVE CONTROLS, TRACKS, SUSPENSION, AND ASSOCIATED COMPONENTS

AUGUST 1994

  TM-9-2350-311-20-1 - Page 935 of 1275

TM 9-2350-311-20-1
10-7 TRACKS (T-154 TRACK) — CONTINUED
b. Installation — Continued
18
19
20
21
22
Reinstall track-connecting fixture on track link pins (6) of last track shoe and track shoe to be connected.
Install two end connectors (2) and tap with hammer to secure. Track link pin (6) must be flush within 0.07 in
(1.8 mm) of end connector face. Install two new end connector bolts (1) and torque to 380-420 Ib-ft (515-569
N·m). Torque end connector bolts on marked end connectors to 380-420 Ib-ft (515-569 N·m).
Repeat steps 17 thru 19 for opposite side of track.
Check track tension and adjust track if necessary (para
Torque bolts again after 50 miles (81 km) of operation.
10-8).
NOTE
FOLLOW-ON MAINTENANCE:
Check and correct track tension (para 10-8)
10-18


Back to Top