TM-9-2520-215-34

CROSS-DRIVE TRANSMISSION ASSEMBLY

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE

DECEMBER 2005

  TM-9-2520-215-34 - Page 15 of 508

TM 9--2520--215--34
0001 00--3
GENERAL INFORMATION – CONTINUED
0001 00
PREPARATION FOR STORAGE OR SHIPMENT
Basic requirements for administrative storage are covered in TM 740--90--1. When materiel is inactivated for a limited
time (not to exceed 90 days), it will be processed in accordance with TM 740--90--1.
The preferred storage site for the vehicle is in a dry, covered shed. When it is necessary to store materiel outdoors, to
protect it from the elements storage shall be prescribed in SB--740--98--1 and TM 743--200.
WARRANTY INFORMATION
No particular warranty specifically pertains to the XT--1410--4 Cross--Drive Transmission.
NOMENCLATURE CROSS--REFERENCE LIST
Nomenclature in this manual was chosen in accordance with the terms used for provisioning as they appear in the
Repair Parts and Special Tools List (RPSTL) and Maintenance Allocation Chart (MAC) TM 9--2350--256--20. A few
tools and components are, however, referred to by names more common than those in the RPSTL. In many cases it
is a shorter name for the same component.
OFFICIAL PROVISIONING NOMENCLATURE
MORE COMMON NAME
Gauge rod
Dipstick, bayonet gauge
Safety wire
Lockwire
Socket head screw key
Hex key
LIST OF ABBREVIATIONS
KPA
Kilopascals
PSI
Pounds per Square Inch
AEPS
Army Electronic Product Support
MWO
Modification Work Order
EIR
Equipment Improvement Report
EIR/MS
Equipment Improvement Report and Maintenance Summary
EIR/MD
Equipment Improvement Report and Maintenance Digest
TAMMS
The Army Maintenance Management Systems
CPC
Corrosion Prevention and Control
HRV
Heavy Recovery Vehicle
MAC
Maintenance Allocation Chart
RPSTL
Repair Parts and Special Tools List
QDR
Quality Deficiency Report
MTOE
Modified Table of Organization and Equipment
CTA
Certified Table of Allowances
APPROX
Approximate
GAL
Gallon
RPM
Revolutions per Minute
LB -- FT
Pound--Feet


Back to Top