TM 9-2815-210-34-2-2
FRAME 4
1.
2.
3.
4.
5.
6.
7.
Turn rheostat (1) until voltmeter (2) reads 24 volts. Pressure gage (3) should
read 90 to 100 psi.
Put bucket (4) under nozzle and valve assembly (5) to catch discharged fuel.
Turn adjustable valve (6) to give fuel flow to nozzle and valve assembly (5).
Check that spray pattern (7) is a uniform, fine spray cone with an angle of
60° to 80°.
Get a new nozzle and valve assembly (5) if there is no spray
pattern or if spray pattern is coarse or out of shape.
Turn off adjustable valve (6).
Turn off rheostat (1).
Turn on adjustable valve (6) to bleed off pressure.
END OF TASK
4-593