TM 9-2815-220-24
TURBOSUPERCHARGER DUST DETECTOR SYSTEM REPLACEMENT
0082 00
CLEANING
1. See Work Package 0028 for General Cleaning Procedures.
INSPECTION
All parts must be inspected with care.
Replace parts if damage or wear exceeds allowable
limits.
1. See Work Package 0028 for General Inspection Procedures.
2. Check switch (1) pop-up function.
a. Apply suction of 5.5 (+/- 0.5) inches mercury to bottom port (A) of pressure switch (1).
b. If red indicator (B) does not pop-up, switch must be replaced.
3. Check switch (1) continuity.
a. With no pressure on either port (A, C), there must be no continuity across connector
pins (D).
b. With suction of 5.5 (+/- 0.5) inches mercury at bottom port (A) of pressure switch (1),
there must be continuity across pins (D) of switch.
c. If switch fails continuity check, it must be replaced.
1
D
B
A
C
WP 0082 00-4