TM 9-2815-220-24
TURBOSUPERCHARGER DUST DETECTOR SYSTEM REPLACEMENT
0082 00
INSTALLATION (Continued)
4. Connect electrical cables.
a. Connect electrical cable connector (2) to pressure switch (1).
b. Connect ground wire (3) using screw (4) with new lock washer (5) (item 92, WP 0175).
1
2
3
4, 5
END OF WORK PACKAGE
WP 0082 00-7 (8 blank)