TM 9-2815-220-24
ENGINE AND CONTAINER REPLACEMENT
0098 00
INSTALLATION
1. Secure engine mount brackets (16) to engine (21) using six screws (23) with
lock washers (25) and nuts (24).
WARNING
2. Attach engine sling assembly (18) (item 37 or 38, WP 0176) to hoist and to lifting eyes (19
and 20).
3. With a helper to guide the load, carefully lift engine (21) and lower into container half (22),
aligning holes in mounting brackets (16) and mounting flanges (17).
4. Remove engine sling assembly (18) from engine (21) and hoist.
14
15
23
19
22
16
25
24
20
21
18
WP 0098 00-5