TM 9-2815-220-24
ENGINE AND CONTAINER REPLACEMENT
0098 00
INSTALLATION (Continued)
5. Secure engine mounting brackets (16) to mounting flanges (17) using four nuts (14) with lock
washers (15).
6. Secure transmission adapter (12) to support flange (13) using seven nuts (10) with lock
washers (11).
7. Attach gasket (9) to upper half of container (8).
8. Attach sling (7) (item 105, WP 0176) to upper half of container (8) and to hoist.
9. With helper to guide the load, carefully lower container upper half (8) in place over
lower half (22).
10. Secure container halves (8) and (22) using 48 screws (6), and nuts (4) with lock washers (5).
11. Remove sling (7) from container half (8) and from hoist.
12. Install valve core (2) into pneumatic valve (3) then fill container assembly (1) to 5 psi
(34.475 kPa) gauge pressure using clean dry air.
6
11
10
13
12
22
2
3
7
8
9
4
5
1
END OF WORK PACKAGE
WP 0098 00-6