TM-9-2815-220-24

AVDS-1790 2CA, 2DA and 2DR Air-Cooled 12-Cylinder Diesel Engines

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL FOR AVDS-1790 2CA, 2DA and 2DR Air-Cooled 12-Cylinder Diesel Engines

  TM-9-2815-220-24 - Page 815 of 1563

TM 9-2815-220-24
TURBOSUPERCHARGER ASSEMBLY REPLACEMENT (2DR)
0100 00
INSTALLATION (Continued)
CAUTION
EARLY MODEL
CONFIGURATION
Early models may have a two-piece hose
connection between the air outlet elbow and
intake manifold.
If your engine has the two-
piece hose connection, you should replace the
existing (two hose and intermediate pipe) set-
up with the one-piece hose (part number
11682625).
Failure to comply may lead to
premature engine failure due to dust
ingestion.
3. Install air outlet elbow (12).
a. Install air outlet elbow (12) with new gasket (15) (item 279, WP 0175) and secure using
six new self-locking nuts (14) (item 33, WP 0175).
Do not tighten at this time.
b. Reposition and tighten hose clamps (13) until spring bottoms, then back-off 1 to 1-1/2
turns.
12
14
(six places)
13,
(two places)
15
WP 0100 00-9


Back to Top