TM-9-3990-260-14-P

CONTAINER ROLL-IN/OUT PLATFORM (CROP) MODEL M3 AND MODEL M3A1

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

JULY 2001

  TM-9-3990-260-14-P - Page 118 of 306

TM 9-3990-260-14&P
NOTE
Perform the following steps for each of two stowage box doors.
a.
Removal.
(1)
Disconnect stowage box door retaining chain hook (1) from the door (2).
(2)
Remove ten rivets (3) and door (2) from hinge (4).
(3)
Remove eight rivets (5) and hinge (4) from deck.
b.
Installation.
(1)
Install hinge (4) to deck with eight rivets (5).
(2)
Install door (2) to hinge (4) with ten rivets (3).
(3)
Connect stowage box door retaining chain hook (1) to door (2).
c.
Repair.
NOTE
Stowage box latches are replaced as a set.
(1)
Remove nut (6), washer (7), bolt (8), and latch (9) from door (2).
(2)
Remove nut (10), washers (11), bolt (12), and latch (13) from stowage box.
(3)
Install bolt (12), latch (13), washers (11), and nut (10) in stowage box.
(4)
Install bolt (8), latch (9), washer (7), and nut (6) on door.
(5)
Replace stowage box retaining chain (14) and hooks (1) by disconnecting the hooks and
removing the chain.
d.
Adjustment.
(1)
Loosen nut (6) securing door mounted latch (9) and nut (10) securing stowage box mounted
latch (13).
(2)
Align door latch (9) and stowage box latch (13). Tighten nuts (6 and 10).
e.
Follow-on Maintenance.
None.
4-24


Back to Top