MWO-9-2330-392-20-2

MODIFICATION OF TRAILER, CARGO: 2-WHEEL M1101 AND M1102, CHASSIS, TRAILER: 2-WHEEL

MODIFICATION WORK ORDER

MARCH 2003

  MWO-9-2330-392-20-2 - Page 13 of 20

MWO 9-2330-392-20-2
13
11. Reinstall breakaway lever spring (10)
(see Figure 17)
between master cylinder and
breakaway lever.
Reinstall master cylinder, torque cap screws to 30 ± 3 ft
·
lb
(see Figure
2).
Ensure correct operation of breakaway system
(see Figure 17)
.
12.
Install landing leg pivot, use one new lock washer with existing screw and two new
locking hex nuts with existing flat washers and existing bolts. Torque screw to 210 ± 20
ft
·
lb and locking hex nuts to 150 ± 10 ft
·
lb
(see Figure 4).


Back to Top