TB 9-2320-279-13-1
0039-2
AC HIGH PRESSURE SWITCH REPLACEMENT - Continued
DRAFT
INSTALLATION
NOTE
Ensure preformed packing is in place in high pressure switch prior to installation.
1. Install preformed packing (6) and high pressure switch (5) on hose (7).
Torque high pressure switch (5)
to 7.5-10 ft-lbs. (10-14 N•m).
NOTE
Install cable ties as required.
2. Connect connector (3) to connector (4).
3. Connect connector (1) to connector (2).
FOLLOW-ON MAINTENANCE
1. Install engine side panel and close engine cover (TM 9-2320-279-10).
2. Connect batteries (TM 9-2320-279-20).
3. Perform leak test inspection (WP 0049).
END OF WORK PACKAGE
HEMAC014