II
106700-7
Rev. -
c.
Install the Stud Plate (P/N 106780-3) and two lifting eye nuts (P/N 106795-1).
d.
Install lift straps through the lifting lugs on the Roof Armor Panel (P/N 106781-3) and
attach them to the appropriate material handling equipment (hoist, forklift, etc.).
e.
Apply urethane (P/N 104302) around the perimeter underside of the hatch opening
prior to lifting the Roof Armor Panel into place on the roof of the HEMTT (See
Figure 41).