TB-9-2320-280-35-12

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR EPLRS NETWORK MANAGER VEHICLE WITH AMTECH TOP

OCTOBER 2006
CHANGE 1

  TB-9-2320-280-35-12 - Page 144 of 162

5-116
TB 9-2320-280-35-12
Change 1
50-8.
Route antenna cable (1) behind heater shield (12) to installation mount (13).
50-9.
Locate, mark, and drill one 0.147-in. diameter hole (16) in plenum (9).
50-10.
Secure antenna cable (1) to plenum (9) with clamp (11) and self-tapping screw (10).
50-11.
Secure excess antenna cable (1) behind installation mount (13) on integrated radio rack (15) with
tiedown strap (14).
13
14
15
9
10
11
1
12
~
~
10. SELF-TAPPING SCREW – 9416639 – QTY. 1
11. CLAMP – MS21333-67 – QTY. 1
14. TIEDOWN STRAP – MS3367-1-0 – QTY. 1
Figure 5-156.


Back to Top