TB-9-2320-280-35-12

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR EPLRS NETWORK MANAGER VEHICLE WITH AMTECH TOP

OCTOBER 2006
CHANGE 1

  TB-9-2320-280-35-12 - Page 139 of 162

5-111
TB 9-2320-280-35-12
Change 1
NOTE
It may be necessary to drill pilot hole prior to drilling 0.562-in.
diameter hole.
49-3.
Locate, mark, and drill one 0.562-in. diameter hole (5) on right side of A-pillar (6).
Figure 5-151.
0.50
1.53
~
6
5


Back to Top