TB-9-2320-280-35-12

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR EPLRS NETWORK MANAGER VEHICLE WITH AMTECH TOP

OCTOBER 2006
CHANGE 1

  TB-9-2320-280-35-12 - Page 129 of 162

TB 9-2320-280-35-12
5-101
Figure 5-141.
47-20.
Strip wire insulation from wire 29A (30).
47-21.
Splice battery alarm box control cable (16) with wire 29A (30).
47-22.
Cover splice with electrical tape (31).
16
31
30


Back to Top