TB-9-2320-280-35-12

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR EPLRS NETWORK MANAGER VEHICLE WITH AMTECH TOP

OCTOBER 2006
CHANGE 1

  TB-9-2320-280-35-12 - Page 123 of 162

TB 9-2320-280-35-12
5-95
3
18
8
14
15
16
17
5
7
5. SCREW – MS90725-6 – QTY. 2
7. LOOP CLAMP – 3225T48 – QTY. 2
8. NUT – MS51967-2 – QTY. 2
14. WASHER – MS27183-12 – QTY. 2
15. LOCKWASHER – MS35338-44 – QTY. 2
Figure 5-134.
46-8.
Locate two existing 0.281-in. diameter holes (18) in multi-net rack (3) support.
46-9.
Route Prosine inverter positive and negative cables (16) and rear battery positive and negative
cables (17) from multi-net rack (3) support to curbside footwell.
46-10.
Secure Prosine inverter positive and negative cables (16) and rear battery positive and negative
cables (17) to multi-net rack (3) support with two clamps (7), screws (5), lockwashers (15),
washers (14), and nuts (8).
~


Back to Top