TB-9-2320-280-35-15

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR RETRANSMISSION VEHICLE WITH AMTECH TOP FOR AN/VRC-92F, AN/UYK-128 (V)4, RT-1812, AN/VSQ-2 (V), AB-1386/U, DAGR, AN/PSN-11

SEPTEMBER 2006

  TB-9-2320-280-35-15 - Page 133 of 168

5-109
TB 9-2320-280-35-15
Figure 5-124.
40-16.
Locate, mark, and drill two 0.188-in. diameter holes (29) in side of tunnel (27).
27
~
29
29
2.75
2.50
10.00


Back to Top