TB-9-2320-280-35-15

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR RETRANSMISSION VEHICLE WITH AMTECH TOP FOR AN/VRC-92F, AN/UYK-128 (V)4, RT-1812, AN/VSQ-2 (V), AB-1386/U, DAGR, AN/PSN-11

SEPTEMBER 2006

  TB-9-2320-280-35-15 - Page 134 of 168

5-110
TB 9-2320-280-35-15
Figure 5-125.
30. CABLE (BATTERY TO SOLENOID) – RCSK-19637 – QTY. 1
31. CABLE (BATTERY TO SHUNT) – RCSK-19638 – QTY. 1
NOTE
Do not connect cables to solenoid and shunt at this time.
40-17.
Route cables (30) and (31) from solenoid and shunt through battery box (3) and hole (23).
23
~
30
31
3


Back to Top