TB-9-2320-280-35-15

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR RETRANSMISSION VEHICLE WITH AMTECH TOP FOR AN/VRC-92F, AN/UYK-128 (V)4, RT-1812, AN/VSQ-2 (V), AB-1386/U, DAGR, AN/PSN-11

SEPTEMBER 2006

  TB-9-2320-280-35-15 - Page 124 of 168

5-100
TB 9-2320-280-35-15
Figure 5-113.
1
2
5
1. RUBBER SHEET – 03A016D-1 – QTY. 1
2. RIVET – AB4-5A – QTY. 5
5. ALUMINUM FLAT BAR – 03A016D-2 – QTY. 1
Section XL. C4ISR POWER CABLES INSTALLATION
NOTE
• Use aluminum flat bar as template to locate and mark hole
position.
• Use No. 30 drill bit to drill holes in battery box.
40-1.
Drill five 0.129-in. to 0.133-in. diameter holes (4) in lip of battery box (3).
40-2.
Install rubber sheet (1) and aluminum flat bar (5) on battery box (3) with five rivets (2).
~
3
4


Back to Top