TB-9-2320-280-35-15

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR RETRANSMISSION VEHICLE WITH AMTECH TOP FOR AN/VRC-92F, AN/UYK-128 (V)4, RT-1812, AN/VSQ-2 (V), AB-1386/U, DAGR, AN/PSN-11

SEPTEMBER 2006

  TB-9-2320-280-35-15 - Page 148 of 168

5-124
TB 9-2320-280-35-15
Figure 5-139.
40-53.
Route red cable (94) from stud (92) of solenoid (21) to control box. Secure cable (94) to solenoid (21)
with nut (93).
40-54.
Route green cable (95) from shunt (13) to control box. Secure green cable (95) to shunt (13) with
screw (96).
40-55.
Route orange cable (98) from shunt (13) to control box. Secure orange cable (98) to shunt (13) with
screw (97).
94. CABLE (CONTROL BOX, RED) – N/A – QTY.1
95. CABLE (CONTROL BOX, GREEN) – N/A – QTY.1
98. CABLE (CONTROL BOX, ORANGE) – N/A – QTY.1
98
95
96
97
13
94
93
92
21


Back to Top