TB-9-2320-302-13-P-3

CREW PROTECTION KIT; AIR CONDITIONING KIT PART 3 OF 3

TECHNICAL BULLETIN; OPERATOR’S, UNIT, AND DIRECT SUPPORT, MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

MARCH 2008

  TB-9-2320-302-13-P-3 - Page 204 of 240

Remove two straps from roof as
existing studs will be used for
mounting the front evaporator
brackets shown below.
Two holes
need to be match drilled into the
front evaporator bracket as shown
in the photo to the bottom left.
Page 22


Back to Top