TB-9-2350-277-40-P-3

CARRIER, MECHANIZED SMOKE OBSCURANT M58

TECHNICAL BULLETIN; INSTALLATION OF CREW II MODIFICATION KIT PART 3 OF 4

JUNE 2009

  TB-9-2350-277-40-P-3 - Page 17 of 88

TB 9-2350-277-40&P-3
INTRODUCTION – Continued
0001 00
0001 00-3/4 blank
8.
Special tools, tool kits, jigs, test, measurement, and diagnostic equipment (TMDE); and fixtures
required.
Installation requires common hand and power tools (wrenches, drill, etc.) furnished by
the maintenance shop/contractor.
No special TMDE, jigs, or fixtures are required.
9.
Expendable/durable items list.
See WP 0013 00.
10. Calibration requirements.
No calibration is required.
11. Weight and balance data.
Weight and balance are not affected.
12. Facilities.
No special facilities are required.
No welding is required.
13. Inspection requirements.
a.
Prior to kit installation, inspect all mounting provisions for signs of fatigue failure, cracking,
and loose or missing attaching hardware.
The Crew II kit cannot be installed until certain hull
mounting provisions have been completed.
See WP 0004 00 for hull preparation procedures.
b.
Ensure all kit parts are available prior to installation.
See WP 0014 00 for a list of kit parts.
Inspect all kit parts for signs of cracking or distortion of the supports and brackets, damaged
cables, and missing hardware.
c.
After kit installation, ensure all kit components are mounted securely.
Inspect the new cables
to ensure they are securely clamped and tied to the existing cables and are not going to be
pinched or damaged during carrier operation.
14. Tools and Equipment.
a.
Commonly-used tools and equipment having application to sustainment maintenance, in
general, furnished by the maintenance activity/contractor.
See WP 0011 00.
b.
Special tools:
See WP 0011 00.
c.
Fabricated tools.
See WP 0012 00.
15. Recording and reporting of the installation.
a.
Reporting requirements.
Refer to AR-750-10/DA Pamphlet 750-8.
b.
Marking equipment.
No marking of equipment or vehicle is required.
16. Material change (MC) number.
Not applicable.
END OF WORK PACKAGE


Back to Top