TB 9-2350-368-25
4-3
Section II. MAINTENANCE
TESTING M113A3/M548A3 OSV POWERPLANT
DESCRIPTION
This task covers: Install (page 4-3). Start (page 4-10). Stop (page 4-12). Remove (page 4-12).
INITIAL SETUP
Tools:
General Mechanic's Tool Kit
Powerplant Sling
Materials/Parts:
Grease
Locknuts (2)
Exhaust Elbow
Suitable Container
Personnel Required:
Unit Mechanic
Helper
References:
LO 9-2350-247-12
LO 9-2350-277-12
TM 9-2350-247 Series
TM 9-2350-277 Series
TM 9-2350-366 Series
TM 9-2815-205-34
TM 38-260
Equipment Conditions:
Powerplant on Blocks
Powerplant Test Stand blocked
INSTALL
WARNING
•
Damaged lifting slings can fail with load. Personnel can be killed
or injured. Inspect all slings before use. Do not use damaged
slings.
•
Hanging loads can kill or injure you. Keep away from hanging
loads and overhead equipment. Keep hands out of area while
powerplant is being lifted for removal or lowered for installation.
NOTE
•
STE-ICE transducers and harness are only on the M113A3 FOV
powerplants.
•
OSV has A3 engine and TX200-4/4A transmission.
•
If testing OSV, refer to TM 9-2350-366 series.