TB-9-2510-251-13

TECHNICAL BULLETIN

OPERATOR AND FIELD MAINTENANCE; INSTALLATION MANUAL (INCLUDING REPAIR PARTS LIST); FOR ADD-ON-ARMOR (AoA) AIR CONDITIONING

AUGUST 2007

  TB-9-2510-251-13 - Page 254 of 624

2-238
TB 9-2510-251-13
2-2.3
Installation of Air Conditioning Kit to M1097A2 Two-Door with O'Gara Hess
Add-on-Armor (Cont’d).
g. Air Distribution Ducting (Cont’d)
(2)
Cut enough flex hose (9) to connect elbow (1) and elbow (8).
(3)
Pre-bend band clamp and flex hose into 2.5 inch square.
(4)
Attach flex hose (9) to elbow (1) and elbow (8) with band clamp (10).
(5)
When air delivery is acceptable, apply a generous quantity of PVC cement
(item 3, Appendix D) to the mating surfaces and secure with screws.
10
8
10
9
1
Figure 2-344.
Flex Hose


Back to Top