TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 108 of 704

TB 9-3950-253-13&P
0009-4
0009
RAISE A PARTIALLY SUBMERGED CONTAINER – CONTINUED
Lock Slide Housings
0009
WARNING
During the following adjustments personnel are required to work outside vehicle where
there are several projecting parts, and personnel are required to bend down. Take care
when bending and straightening. A hard hat is required. Failure to follow this warning may
result in injury to personnel.
NOTE
The following procedure is for left upper slide lock. Repeat same procedure for right side.
1. Remove locking pin (Figure 6, Item 4) from slide housing (Figure 6, Item 1).
2. Push locking handle (Figure 6, Item 3) toward container (Figure 6, Item 2) to secure slide lock in upper corner
casting.
3. Install locking pin (Figure 6, Item 4) in slide housing (Figure 6, Item 1).
Figure 6.
Lock Both Slide Housing Locking Handles.
09
467-183
1
1
2
2
3
4
4
3


Back to Top