TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 102 of 704

TB 9-3950-253-13&P
Change 1
0008-24
0008
UNLOAD CONTAINER – CONTINUED
Detach Lift Frame from Container
0008
1. Keeping engine at idling speed, set joystick (Figure 27, Item 1) to LOAD (PLS: TM 9-2320-364-14&P, HEMTT:
TM 9-2320-326-14&P). Hook arm (Figure 27, Item 2) will raise lift frame (Figure 27, Item 3) and upper guides
from container (Figure 27, Item 4). When raised approximately 6 in. (183 cm), release joystick.
Figure 27.
Detach Lift Frame from Container.
08
2. Keeping engine at idling speed (PLS: TM 9-2320-364-14&P, HEMTT: TM 9-2320-326-14&P), drive vehicle
(Figure 28, Item 1) forward approximately 2 ft (0.6 m) to separate lift frame (Figure 28, Item 3) from container
(Figure 28, Item 4).
Figure 28.
Separate Lift Frame from Container.
08
467-187
4
3
2
1
467-188
4
3
1
2


Back to Top