TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 161 of 704

0016-17/(18 Blank)
TB 9-3950-253-13&P
0016
END OF TASK
END OF WORK PACKAGE
LIFT FRAME
NOTE
If time and mission allows, fully deploy lift frame and perform
checks as instructed.
27
Monthly
Lift Frame
a. Apply Grease, Automotive and
Artillery, GAA (WP 0060, Item 8) to
fittings on:
1. Stowage roller (LH and RH).
2. Stowage roller locking and pivot
pin (LH and RH).
b. Apply Grease, Automotive and
Artillery, GAA (WP 0060, Item 8) to
surface of:
1. Upper lock slide area.
2. Container locking pin.
Figure 14.
Lift Frame Lubrication.
016
Table 1.
Operator Preventive Maintenance Checks and Services (PMCS),
Including Lubrication Instructions for the E-CHU - Continued.
ITEM
NO.
INTERVAL
LOCATION
PROCEDURE
NOT FULLY MISSION
CAPABLE IF:
ITEM TO
CHECK/
SERVICE
467-162
PIVOT PIN
STOWAGE ROLLER
CONTAINER
LOCKING PIN
UPPER LOCK
SLIDE AREA
LOCKING PIN


Back to Top