TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 424 of 704

TB 9-3950-253-13&P
Change 1
0044-8
0044
INSTALLATION – CONTINUED
00044
Supply Hose Installation
0044
NOTE
Perform step 1 for HEMTT M1120, step 2 for HEMTT M1120A4, and step 3 for PLS.
1. Connect pneumatic hose (Figure 9, Item 2) to press-lock fitting (Figure 9, Item 1).
Figure 9.
HEMTT M1120 Air Tank Hose Installation.
044
2. Connect pneumatic hose (Figure 10, Item 1) to press-lock fitting (Figure 10, Item 2).
Figure 10.
HEMTT M1120A4 Air Tank Hose Installation.
044
2
1


Back to Top