FIELD MAINTENANCE
-
UNPACKING AND PARTS LIST
Unpacking of Crates, Layout, Installation Parts List
UNPACKING OF CRATES
00050
Before opening the crates, inspect their condition. Look for any damage such as dents or scratches on outside of
crates. Ensure that the correct ends are up and that the skids of the crate are in good order. If ANY appearance of
damage exists, report this immediately to a supervisor or person in charge of the materials. This is imperative to
maintaining proper quality control of the Enhanced Container Handling Unit (E-CHU).
Verify that unique kit box strapped to lift frame pallet matches the truck that the kit will be installed on.
LAYOUT
00050
Proper care must be taken to ensure that the items are placed in an open area to take proper inventory. Properly
staging the components around the machine will ensure that the parts are present and it will also aid in a speedy
installation of the E-CHU.
INITIAL SETUP
Tools and Special Tools
0
Tool Kit, General Mechanic’s
(WP 0057, Item 2)
0
Tool Set, SATS Base (WP 0057, Item 3)
0
Sling, Nylon (WP 0057, Item 1)
0
Lifting equipment (2,000-lb capacity)
0
Personnel Required
0
Two (63B - Wheeled Vehicle Mechanic)
0
Equipment Condition
0
Vehicle parked on level ground, in neutral gear
with parking brake applied (PLS: TM 9-
2320-364-14&P, HEMTT: TM 9-2320-326-
14&P)
0
6