TM-1-1500-344-23-2

AIRCRAFT VOLUME II

TECHNICAL MANUAL; CLEANING AND CORROSION CONTROL

APRIL 2009

  TM-1-1500-344-23-2 - Page 97 of 240

4-21
NAVAIR 01-1A-509-2
TM 1-1500-344-23-2
15 April 2009
Figure 4-7. Shaping Reworked Areas
Corrosion Damage Before Rework
Pit has been cleaned up to the extent that all
loose corrosion products have been removed.
Depression After Corrosion Removal
Rough edges have been smoothed and all
corrosion has been removed.
However, depression has not been shaped.
Dish-Out After Blending
Blending has been accomplished.


Back to Top