TM 5-2330-378-14&P
4-40. THREE-POINT TERMINAL STRIP REPLACEMENT (M870A1) (continued).
b.
INSTALLATION
1.
Position terminal strip (4) on box cover (2). Secure terminal strip (4) to box cover (2) with two new self-locking
nuts (10) and mounting screws (9).
2.
Install three wires (3) on terminal strip (4). Secure wires (3) to terminal strip (4) with three screws (8).
3.
Carefully rotate three resistors (6) and clips (7)
over terminal strip (4) and secure with three
screws (5).
4@
Install box cover (2) on semitrailer, making
5
sure that wires are not pinched between box
5
cover (2) and semitrailer.
Install two bolts (1)
7
securing cover (2) to semitrailer.
3
6
5.
Withtheaid
of an assistant, connect semitrailer
electrical connectors
to towing vehicle ancitest
10
lights for proper operation.
r
10
6
8
04
2
9
9
FOLLOW-ON
TASKS:
- None
4-92