TM-5-2350-262-20-3

ARMORED COMBAT EARTHMOVER (ACE), M9

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL; VOLUME 3 OF 3; HYDRAULIC TROUBLESHOOTING TEST PROCEDURES

  TM-5-2350-262-20-3 - Page 127 of 319

3-92
TM 5-2350-262-20-3
YES
from block 3
To block 20
YES
NO
FRONT CORNER (LEFT OR RIGHT) RAISES IN SPRUNG, BUT NOT UNSPRUNG MODE
(CONTINUED)
7
NO
from block 4
7
Replace directional control valve bank.
6
Perform control valve pressure test.
Is pressure between 25 psi (172 kPa) and 2,500
psi (17,238 kPa)?


Back to Top