TM-5-2350-262-20-3

ARMORED COMBAT EARTHMOVER (ACE), M9

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL; VOLUME 3 OF 3; HYDRAULIC TROUBLESHOOTING TEST PROCEDURES

  TM-5-2350-262-20-3 - Page 123 of 319

3-88
TM 5-2350-262-20-3
YES
NO
YES
from block 2
To block 6
To block 4
3
Perform SPRUNG/UNSPRUNG valve
linkage check.
Is linkage correctly adjusted?
FRONT CORNER (LEFT OR RIGHT) RAISES IN SPRUNG, BUT NOT UNSPRUNG MODE
(CONTINUED)
7


Back to Top