TM-5-2350-262-20-3

ARMORED COMBAT EARTHMOVER (ACE), M9

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL; VOLUME 3 OF 3; HYDRAULIC TROUBLESHOOTING TEST PROCEDURES

  TM-5-2350-262-20-3 - Page 187 of 319

3-152
TM-5-2350-262-20-3
YES
from block 35
40
Remove all test equipment and connect lines.
Replace or repair apron cylinder.
39
Perform apron cylinder leakage test.
Is extension rate greater than 1/2 in. (13 mm)
per minute
YES
NO
10
HYDRAULIC OIL OVERHEATS (CONTINUED)
To block 41


Back to Top