TM-5-2350-262-20-3

ARMORED COMBAT EARTHMOVER (ACE), M9

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL; VOLUME 3 OF 3; HYDRAULIC TROUBLESHOOTING TEST PROCEDURES

  TM-5-2350-262-20-3 - Page 193 of 319

3-158
TM-5-2350-262-20-3
To block 48
YES
from block 42
YES
NO
10
HYDRAULIC OIL OVERHEATS (CONTINUED)
46
Perform case drain leakage test.
Is internal leakage more than 1.25 qts (1.2 L)
for 15 seconds?
47
Replace compensating pump.


Back to Top