TM-5-2350-262-20-3

ARMORED COMBAT EARTHMOVER (ACE), M9

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL; VOLUME 3 OF 3; HYDRAULIC TROUBLESHOOTING TEST PROCEDURES

  TM-5-2350-262-20-3 - Page 201 of 319

3-166
TM-5-2350-262-20-3
YES
from block 53
57
Perform actuator internal leakage test on No. 1 or
No. 4 actuators where excessive heat in circuit 9 or
2 hoses was detected.
Is leakage rate greater than 1/2 gpm (1.89 Lpm)?
58
Remove all test equipment and connect hoses.
Replace leaking actuator.
YES
To block 59
NO
10
HYDRAULIC OIL OVERHEATS (CONTINUED)


Back to Top