TM 5--2350--378--24&P
0012 00--29
EJECTOR DOES NOT EXTEND OR RETRACT -- Continued
0012 00
Figure 20. HDC Control Box
Figure 21. DCV Bank
EJECTOR CIRCUIT PRESSURE CHECK -- CONTINUED
Disable ejector by manually closing the ejector inhibit ball valve V23 (Figure 21, item 1)
on the DCV bank. Using LINE UP or LINE DOWN button (Figure 20, item 3), select V1
on the HDC display (Figure 20, item 2). Close V1 on the HDC display (Figure 20, item
2), by selecting the CHANGE POSITION button (Figure 20, item 4) on the HDC control
box.
Have assistant start engine and hold EJECTOR CONTROL lever in the FORWARD
position. Read transducer T--2 hydraulic pressure on the HDC display (Figure 20, item
1).
Stop engine; relieve hydraulic pressure.
Enable ejector by manually opening ejector inhibit ball valve V23 (Figure 21, item 1) on
the DCV bank. Using LINE UP or LINE DOWN button (Figure 20, item 3), select V1 on
the HDC display (Figure 20, item 2). Open V1 on the HDC display (Figure 20, item 2),
by selecting the CHANGE POSITION button (Figure 20, item 4) on the HDC control box.