TM-5-2350-378-24-P

HYDRAULIC DIAGNOSTIC CENTER (HDC) SUPPORTING ARMORED COMBAT EARTHMOVER (ACE), M9

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

  TM-5-2350-378-24-P - Page 398 of 790

TM 5--2350--378--24&P
0016 00--95
HYDRAULIC OIL OVERHEATS -- Continued
0016 00
Figure 67. Actuator Accumulator Pressure Test
ACTUATOR ACCUMULATOR PRESSURE TEST -- CONTINUED
Tighten nut (Figure 67, item 6) on actuator accumulator (Figure 67, item 6). Close nitrogen tank
valve (Figure 67, item 1) to ease pressure. Open bleed valve (Figure 67, item 11), bleed line
pressure to 0 psi. Remove adapter valve (Figure 67, item 10) from actuator accumulator
(Figure 67, item 10). Remove pressure measuring device (Figure 67, item 5) from bleed valve
(Figure 67, item 11) on charging harness (Figure 67, item 4). Install valve cap (Figure 67,
item 8) on actuator accumulator (Figure 67, item 10).


Back to Top