TM-5-3805-264-13-P

TRUCK, DUMP, HEAVY, BODY M917A1 AND M917A2

TECHNICAL MANUAL; OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

JUNE 2014

  TM-5-3805-264-13-P - Page 134 of 660

Table 1.
Operator Preventive Maintenance Checks and Services (PMCS) - Continued.
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
NOTE
Review all WARNINGs,
CAUTIONs, and NOTEs before
performing PMCS and operating
the dump body.
Perform all PMCS checks if:
You are the assigned
operator but have not
operated the dump body
since the last
Weekly
inspection.
You are operating the
dump body for the first
time.
1
Before
Front and
Driver's Side
Overall View
Check under vehicle for evidence of hydraulic fluid
leakage.
Class III hydraulic fluid
leaks are evident.
2
Before
Inside Cab
Cargo Cover
Crank Handle
Check that crank handle is stowed in storage pouch in
Basic Issue Items (BII) box.
3
Before
Startup
NOTE
Dump truck’s chassis air system controls
both models’ tailgate locking mechanism
and supplies air to the M917A1 with
Material Control System (MCS) and
M917A2 with MCS tailgate.
1. Start engine and fully pressurize air system
(TM 9-2320-363-10 or TM 9-2320-302-10).
2. Listen for air leaks on chassis and at rear of dump
body.
Air leakage is evident.
TM 5-3805-264-13&P
0017
0017-2


Back to Top