Table 1. Operator Preventive Maintenance Checks and Services for M917 Dump Truck Body - Continued.
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT NOT
READY/AVAILABLE
IF:
18.
After
Hydraulic control
valve
(Figure 18, Item 1)
Check for signs of hydraulic leaks from
control valve.
Class III leaks are
evident.
1
Figure 18. Hydraulic Control Valve.
19.
Weekly
Wiring
(Figure 19, Item 1)
and connectors
Check for frayed or damaged wires or
connectors.
1
1
1
Figure 19. Wiring and Connector.
TM 5-3805-274-13&P
0019
0019-11