TM 5-4210-249-13&P-1
0037-1
DRAFT
0037
OPERATOR MAINTENANCE
CORD REEL OPERATION
STARTING CORD REEL OPERATION
1.
Put GENERATOR PTO switch (1) to on position.
Indicator light (2) will illuminate.
2.
Unstow rear work platform (WP 0037).
3.
Open rear compartment door (WP 0010).
4.
Put breakers 1 and 3 (3) and 2 and 4 (4) to ON position.
5.
Remove light box (5) from bracket (6).
6.
Pull light box (5) to required location.
7.
Complete mission.
END OF TASK
TFFT2262