TM 5-4210-249-13&P-1
0105-6
DRAFT
0105
TFFT02781
Step 7.
Remove relay P2 (WP 0413).
With a test lead set, check for continuity across pump
house power distribution wire harness wire 2328 (green) from relay P2 connector,
terminal 2 to relay P3 connector, terminal 2.
If there is no continuity, replace pump house power distribution wire harness
and block (WP 0457).
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION